WIN-170-2005 (Section 36 Wind Farm)
https://dpea.scotland.gov.uk/CaseDetails.aspx?id=121226
Shepherds Rig Wind Farm, Near Carsphairn, DG7
593306
256175
Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Estimated Installed Maximum Generation
Capacity Of 78.6 Mw, Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works
Dumfries and Galloway Council (8/1939/S36)
Site Inspection, Inquiry, Hearing
24 Feb 2021
21 Aug 2023 (Application Granted)
Wind Farm (two or more turbines),
Battery Storage,