WIN-270-14 (Section 36 Wind Farm)
https://dpea.scotland.gov.uk/CaseDetails.aspx?id=121527
Kirkan Wind Farm, Approximately 5.8 Km North West Of Garve, IV15
867757
236196
Application For Consent Under Section 36 Of The Electricity Act 1989 For The Construction And Operation Of A Wind Farm Comprising 17 Turbines With A Hub Height Of Up To 104 Metres And A Maximum Height To Blade Tip Of Not More Than 175 Metres, With An Anticipated Installed Capacity Of 81.6 Mw, And Associated Infrastructure
81.60
Highland Council (N/A)
Kirkan Wind Farm Ltd
Inquiry, Hearing
Report
Decision issued
Mr Robert Seaton
01 Dec 2021
25 Jul 2023 (Application Granted)
Wind Farm (two or more turbines),