CIN-330-001 (Called-in application)
https://dpea.scotland.gov.uk/CaseDetails.aspx?id=121825
Faray Windfarm, Orkney, KW17 2DH
1037250
352985
Erect 6 Wind Turbines (Maximum Height 149.9 Metres, Maximum Wind Farm Capacity 50Mw) With An Indicative Capacity Of 28.8 Mw, Erect A Meteorological Mast (Maximum Height 90 Metres) And A Substation, Construct Access Tracks, Crane Hardstandings, Underground Cabling, Transformers And A Slipway And Jetty, Create A Borrow Pit And Associated Infrastructure
Orkney Islands Council (20/240/TPPMAJ)
Site Inspection, Further Written Submission
21 Dec 2022 (Application Granted)
Wind Farm (two or more turbines),