WIN-110-1 (Section 36 Wind Farm)
 https://dpea.scotland.gov.uk/CaseDetails.aspx?id=121426
 Fetteresso Wind Farm, Stonehaven, AB39 2NH
 -2.2418169
 56.962928
 785770
 385394
 Construction Of A Wind Farm Comprising; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 200 Metres; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 180 Metres; And Six Turbines With A Maximum Height (Base To Tip) Not Exceeding 149.9 Metres, With An Operating Portfolio Generating Capacity Of Over 569 Mw
 08 Feb 2021
 Aberdeenshire Council (APP/2019/1341)
 Ms Geum Howatson
 Fetteresso Wind Ltd
 Site Inspection, Further Written Submission, Inquiry, Hearing
 Report
 Decision issued
 Smith, Morag (Tel: 0131 244 8173 - Email: Morag.Smith@gov.scot)
 Mr Andrew Sikes
 13 Sep 2021
 02 Apr 2022
 21 Sep 2022 (Application Granted)
 Wind Farm (two or more turbines),
 
contains

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 6 of 6
Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
15 Sep 2021 15 Sep 2021 Note of Meeting DPEA Note of Pre examination Meeting 0.13MB (URL Details)
03 Sep 2021 03 Sep 2021 Correspondence DPEA to all opt-in parties Attaching PEM agenda 0.13MB (URL Details)
01 Jun 2021 01 Jun 2021 Correspondence DPEA to parties Enclosing copy of note of pre-examination meeting of 24 May 2021 0.14MB (URL Details)
27 May 2021 01 Jun 2021 Note of Meeting DPEA Note of pre-examination meeting of 24 May 2021 0.22MB (URL Details)
11 May 2021 11 May 2021 Agenda DPEA PEM Agenda 0.20MB (URL Details)
11 May 2021 11 May 2021 Correspondence DPEA to all opt-in parties Attaching PEM agenda 0.14MB (URL Details)

Click table headers to sort table

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 6 of 6