PPA-170-2168 (Planning Permission Appeal)
 https://dpea.scotland.gov.uk/CaseDetails.aspx?id=122894
 Proposed Callisterhall Wind Farm, Land Comprising Birny Hill And Standingstone Edge Above Winterhope Reservoir North Of B7068 Road, Approximately 7.5Km To The West Of Langholm, DG11
 -3.1265206
 55.141754
 583624
 328290
 Erection Of Wind Farm Comprising Seven Wind Turbines (Maximum Height To Blade Tip Of 200 Metres And Indicative Installed Capacity Of Up To 39.2Mw) And Associated Infrastructure Including Crane Hardstandings And Lay Down Areas, 1 Anemometer Mast (Maximum Height Up To 125 Metres), Substation, Battery Storage Up To 7Mw With Associated Control Building, Formation Of Access Tracks, Watercourse Crossings, Up To 3 Borrow Pits, Underground Cables, Temporary Construction Compound And Associated Works
 7
 200.00
 39.20
 Planning permission
 19 Dec 2022
 Dumfries and Galloway Council (22/0930/FUL)
 19 May 2022
 Callisterhall Ltd.
 Failure to give a decision
 Site Inspection, Further Written Submission
 Recalled
 Report Issued
 Hughes, Allen (Tel: . - Email: Planning.Decisions@gov.scot)
 Mr David Liddell
 02 Oct 2023
 **Case Update – 16/02/2024** A report for this case has been submitted to Scottish Ministers. A decision by Scottish Ministers will be made in due course.
 Wind Farm (two or more turbines), Battery Storage,
 
contains

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 1 of 1
Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
30 Mar 2023 31 Mar 2023 Correspondence Consultee - NATS Safeguarding NATS Safeguarding confirming withdrawal of Objection 0.17MB (URL Details)

Click table headers to sort table

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 1 of 1