PPA-270-2147 (Planning Permission Appeal)
https://dpea.scotland.gov.uk/CaseDetails.aspx?id=117292
Land 1810M South Of Blairmore Farm, Kiltarlity, Blairmore, Inverness, IV4 7HT
The Construction And Operation Of A Wind Farm Of Up To 30Mw Installed Capacity, Comprising 10 Turbines With Max Tip Height Of 126M Together With Associated Infrastructure
Planning permission
Highland Council (15/03998/FUL)
Druim Ba Sustainable Energy Limited
Failure to give a decision
Site Inspection, Further Written Submission, Inquiry, Hearing
14 Dec 2016
28 Jun 2018 (Appeal Dismissed )
Wind Farm (two or more turbines),